Enshore Subsea

1-1 of 1 Articles
Clock icon 2 minutes

The 220 kV, three-phase export cable was installed in three 28-kilometre sections by Enshore Subsea using the CMOS Installer cable lay vessel operating from the Port of Blyth. 

1-1 of 1 Articles