Equinor

1-2 of 2 Articles
Clock icon 3 minutes

The Scottish Government has granted consent for a new gas-fired power station with carbon capture at Peterhead, a joint venture between SSE and Norway’s Equinor. The Peterhead Carbon Capture Power Station is planned to generate roughly 900 to 910 megawatts of electricity and is designed to cap

Clock icon 2 minutes

The world’s first commercial-scale floating wind farm, which began operation off the Aberdeenshire coast six years ago, is now due for major maintenance work. Siemens Gamesa wind turbines at the 30 MW Hywind Scotland will be towed to the Gulen Port in Norway for repairs over the summ

1-2 of 2 Articles