Construction leads - September 21st

MIXED USE and NON-RESIDENTIAL

Applicant: Finance Development LLP.

Planning Authority: Edinburgh 

Details: Proposed residential and office development comprising the change of use, extension and alteration of the existing office building to form residential accommodation and office / co-working space, demolition of the existing rear extension and construction of a new build residential development; with associated active travel routes, open space, parking and other infrastructure.



Location:  10 Orchard Brae, Edinburgh

Agent: Scott Hobbs Planning Ltd. FAO: Paul Scott, 24A Stafford Street, Edinburgh

Reference: 21/04687/PAN

Application Link 



 

RESIDENTIAL – FEWER THAN TEN UNITS

Applicant: Dalidichen Investments Limited.

Planning Authority: Edinburgh 



Details: Change of use from a restaurant on lower ground, ground and first floor into 3  flats.

Location: GF 9 South Charlotte Street, Edinburgh

Agent: Timber Bush Associates Ltd, FAO: Graeme Blackwood, 2 Seton West Mains, Tranent

Reference: 21/04560/FUL



Application Link 

 

Applicant: Bield Housing & Care.

Planning Authority: Edinburgh



Details: External and internal alterations to facilitate change of use from class 4 (office) to Sui Generis (residential flats).

Location: 35 Hopetoun Street, Edinburgh

Agent: Savills (UK) Ltd. FAO: Craig Gunderson, Wemyss House, 8 Wemyss Place, Edinburgh

Reference: 21/04591/FUL



Application Link 

 

TENDERS

Contract Authority: University of Dundee

Details: The Works comprise roof slating, tiling and flat roofing works associated with maintenance works, minor alterations, new works and the like.

Location: Dundee

Contact: c.s.girdwood@dundee.ac.uk

Publication Date: 20/09/2021

 

Contract Authority: Scottish Prison Service

Details: The original hot water distribution system within Harviestoun Hall at HMP Glenochil comprises of hot water flow pipework with trace heating (no secondary hot water returns) to ensure adequate hot water temperatures are maintained. The system is approaching the end of its useful economic life. As a result, SPS requires a Contractor to design, supply and install a new hot water return pipework system within Harviestoun Hall to ensure adequate hot water flow and return temperatures.

Location: Glenochil

Contact: Jennifer.Cleworth@sps.pnn.gov.uk

Publication Date: 20/09/2021

Share icon
Share this article:

Related Articles