Ramboll

16-21 of 21 Articles
Clock icon 5 minutes

For the first time, polar ships have moored at a new £40 million wharf at British Antarctic Survey’s (BAS) Rothera Research Station in Antarctica. The RRS James Clark Ross used it to re-supply the station and pick up staff for return to the UK. Construction partners and designers of the

Clock icon 5 minutes

Three international engineering teams are in the running to build the first opening road bridge over the River Clyde. Artist impression of the proposed River Clyde bridge. Image credit: Kettle Collective/Sweco

Clock icon 2 minutes

The first phase of the HALO regeneration plan in Kilmarnock has now been submitted to East Ayrshire Council for detailed planning permission following the recent approval of planning permission in principle for the development masterplan. Located on the site of the former Johnnie Walker bottling pla

Clock icon 2 minutes

Graham Stewart Graham Stewart is the UK Head of BIM at Ramboll, a global multidisciplinary engineering, design and consultancy business, which employs over 12,800 people across 300 offices.

Clock icon 4 minutes

Keppie Design has called for architects to address the gulf between education and practice as it announced Cumnock Academy as the winner of the top prize at the finale of its ‘Interaction’ challenge. Run in partnership with East Ayrshire Council and Ayrshire College, Interaction was an enterpris

16-21 of 21 Articles